

Action @ Aireys - Summer 2009 Archived News>>
To subscribe to our six monthly electronic newsletter please contact us.
Marsden Cove - Stage 2 »
7/12/2009 - James Greenwood
The second stage of Marsden Cove Ltd’s residential canal subdivision at Marsden Bay, Whangarei Harbour is to be completed by Christmas 2009. The canal area is approximately 3ha, allowing boats to moor on private pontoons with more than 2.5m draught. There are 75 residential properties surrounding the canals.
Pauanui Waterways »
7/12/2009 - James Greenwood
Stage 3 of the Pauanui Waterways Canal development commenced in June 2009.
Fire Reinstatement of Placemaker’s Building at Whitianga »
7/12/2009 - Murray Smith
At about 8:30pm on Thursday, 8 January 2009 the fire siren at the Whitianga Fire Station sounded and most people in Whitianga could see a black pall of smoke coming from the Placemakers building located on Joan Gaskill Drive.
Fire Safety of Buildings »
7/12/2009 - Roger Twiname
The Fire Safety Documents have seen extensive changes since the Building Act 1991, with many amendments as the relatively new science of fire engineering develops. Roger Twiname review the requirements.
Client Testimonial »
7/12/2009 - Kathy Lynne
Airey Consultants Limited has provided me with nearly twenty years of engineering advice...
Low Impact Design and the Long Bay Structure Plan »
7/12/2009 - Jan Heijs - North Shore City Council
A Low Impact Design (LID) was included in the proposed Long Bay Structure Plan. Find out more what this involved...
Another Aireys High Flyer (or rather low flyer) »
7/12/2009 - Murray Smith
Congratulations to Simon Marshall for winning the Low Flying completion at the Royal NZ Aero Clubs Regional competition

