A A 7-lot subdivision around an existing dwelling. Site constraints included steeply sloping ground, an existing overland flow path, and no wastewater reticulation.

 

Services Provided

Civil engineering design and construction monitoring of all civil infrastructure, including a 200m directional drill under the Upper Harbour Motorway (SH18) to provide public wastewater reticulation to the property. 

Structural engineering design and construction monitoring of a timber pole retaining wall.

Every build needs a strong foundation

Choose Airey and give your project the foundation it deserves. Our confidence has been earned from over half a century in engineering and construction.