Airey was involved on the Pacific Heights residential subdivsion project since 2021, providing civil engineering design and construction monitoring for Stage 2, covering approximately 20 hectares. We also provided Engineer to the Contract and client-side technical advisor services on this project

Project Challenges

  • 300,000m3 of earthworks on steep slopes with difficult geotechnical conditions. The site is close to a highly valued ecological corridor and sensitive receiving environment.
  • Extensive retaining walls required throughout, including mechanically stabilised earth walls.
  • Civil infrastructure (roading, drainage, water, utilities) to serve 200 residences in Stage 2, including trunk watermain diversions.
  • Power supply diversions required complex drilling installations.

Every build needs a strong foundation

Choose Airey and give your project the foundation it deserves. Our confidence has been earned from over half a century in engineering and construction.